  • Tower AC installation includes proper positioning, alignment, fitting, and connection of the AC unit at the designated installation location.
  • The installation area must be ready, accessible, and structurally suitable before the technician arrives.
  • Standard installation includes basic indoor and outdoor unit installation, where applicable.
  • Existing materials will be used only if they are suitable and in proper condition.
  • Additional copper/refrigerant piping, drain piping, insulation, wiring, cables, brackets, stands, or other materials required due to site conditions will be charged separately.
  • Electrical wiring, new power points, MCB installation, plug/socket replacement, or electrical modifications are not included unless specifically mentioned.
  • Any new wall opening, drilling, cutting, masonry, fabrication, civil work, or structural modification will be charged separately.
  • Refrigerant/gas charging, vacuuming, leak testing, or refrigerant-related work is not included unless specifically mentioned in the quotation.
  • Transportation, shifting, loading, and unloading of the AC unit are not included unless specifically mentioned.
  • Additional labour charges may apply for difficult access, excessive installation height, restricted working space, special equipment, or additional manpower.
  • The customer must provide safe and clear access to the installation location and work area.
  • The company is not responsible for pre-existing damage, weak structures, concealed wiring/piping, or defects in the existing installation.
  • Any defective or damaged component identified during installation will be informed to the customer, and repair or replacement charges will apply separately.
  • Installation does not cover repair of pre-existing technical issues such as cooling problems, refrigerant leakage, electrical faults, compressor faults, or other defects.
  • Any additional parts, labour, electrical work, civil work, fabrication, or repair will be carried out only after customer approval.
  • Final charges may vary depending on the AC model, installation location, accessibility, piping requirements, and actual site conditions.
  • After installation, basic operational testing will be carried out to verify the AC's functioning.
  • Payment for additional materials, parts, labour, or services must be made as per the applicable quotation/invoice.

Booking Summary

TOWER AC INSTALLATION ₹2,099.00 / Unit
1
Service Amount (1 item) ₹2,099.00
Minimum Booking / Visiting Charge ₹99.00
Pay Now Visiting charge to confirm booking
₹99.00

Pay After Service Settle the balance once work is done
₹2,000.00
Total ₹2,099.00